ENERGY GROUP

Projects

Under Operation

ALAKÖPRÜ DAM & HEPP

Under Operation

Total investment cost:  $ 75 .000.000

Location:   Anamur / Mersin

Total installed capacity:  32 MW

Electricity generation capacity: 100 million kWh

Reservoir volume:  130,000,000 m3

Tranmission Line Length: 11 Km/ 477 Double Circuit

KARADAĞ WPP

Under Operation

Total investment cost:  $ 35.000.000

Location:   Çeşme/İzmir

Total installed capacity:  16.25 MW

Annual production:  65 million kWh

Transmission Line  Length: 17 Km / 477 Double Circuit

DUMLU HEPP
Under Operation

Total investment cost: $ 5.000.000

Location:   Dumlu/Erzurum

Total installed capacity:  4 MW

Annual production:  7 million  kWh

Transmission Line Length: 1,050 m

KILCAN HEPP
Under Operation

  Total investment cost:  $ 3.500.000

  Location:   Narlı/Dalaman

  Total installed capacity:  3 MW

  Annual production:  7.5 million kWh

  Transmission Line Length: 1,050 m

MARMARA RES
Ünder Operation

Total Investment Cost:  $ 11.500.000

Location:   Erdek/Balıkesir

Total Installed Capacity:  9,6MW

Annual Production:  33,6 milyon  kWh

Projects

Under Development

CİZRE DAM & HEPP

Under Development

Total investment cost:  $ 380.000.000

Location:    Cizre / Şırnak

Total installed capacity:  340 MW

Annual production:  1.2 billion kWh

Executive Summary of The Cizre DAM & HEPP Project >>